When you build a new house or extend, the most important thing you can't overlook is Foundations . If you choose the wrong type of pile for the site, you risk not only the house settling in the future but also cracking the neighbouring houses and causing big trouble. The question every homeowner faces is what is the difference between driven piles and bored piles, and which should you choose? Here is an easy-to-understand summary.
Driven piles are precast concrete piles made in a factory and driven into the ground with a pile driver to the required depth. They're cheaper, quick to install and you can be sure of the concrete quality, but the big drawback is that they cause very strong vibration during driving, and the soil shifts and pushes on the surrounding area, so they suit open sites reasonably far from other buildings.
Bored piles are made by drilling a deep hole of the designed size with a machine, inserting a reinforcing cage, then pouring concrete to cast the pile in the ground. The advantage is very little vibration and no soil movement pushing on nearby buildings, which makes them ideal for building in housing estates, extensions close to an existing house, or narrow sites a large pile-driving rig can't reach. The downside is that they cost more and need skilled, careful workmanship.
Safety warning: Foundations are the main structural work, affecting the safety of lives and property. Before starting construction or choosing piles, you must get advice and engineering calculations from a qualified civil engineer only. Never change the pile type or downgrade the specification yourself, to prevent the house settling or the structure failing in the long term.