Sign up
Account & tools
Home · Articles · Home finance
Home finance

12 hidden costs of building a house that aren't in the BOQ

2026-07-13 · read 75 times
12 hidden costs of building a house that aren't in the BOQ
Photo by Jakub Żerdzicki on Unsplash

A contractor's price covers the "house itself", but a livable house always costs more. Here are 12 items usually not in the BOQ, in order from before to after, with rough price ranges for a typical house (provincial/suburban — inner Bangkok may be higher)

Before building

During and after building

A safe budgeting formula

Real total budget = BOQ construction cost × 1.25 to 1.35 — this multiplier covers the 12 items above plus a buffer for the unexpected. If the number is too much, shrink the house at the design stage rather than running out of money midway and ending up with a house with no fence and no AC that you can't actually live in

Related materials/equipment

This article is general guidance, not legal, financial or engineering advice for your specific case — for electrical, structural, safety, contract or large-money matters, check with a licensed professional or lawyer before deciding

Related articles

Rooftop solar for homes — is it worth it and how to start, for people who know nothing about electricity
Why budgets balloon: 6 main causes and how to keep control
Home construction loans: what banks look at and how to prepare to get approved easily