General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Before construction and preparing the land
Setting out the building and checking the property lines
- This page contains
- The setting-out day sequence — what happens in what order
- Three kinds of pegs, and land boundary markers
- Walk the site once before the piling rig arrives
- Which side is parallel to the road, or to the boundary — the question to answer before stringing the first line
- Setbacks and clearances — figures that mean demolition if they're wrong
- The ±0.00 level and benchmarks — the figure everything after this refers to
- Proving the layout is square, and how to preserve the lines so you can find them again
- Measure cumulatively from one peg, not section by section
- Documents and photos you must get from setting-out day
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use