General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Finishing and external works
Interior finishing and built-ins
- This page contains
- Six points on a cabinet door — in the order they should be checked
- Built-in kitchen — the most expensive item of the finishing work
- Core and surface materials — the only question is which can be used in wet areas
- Hinges, drawer runners and handles — small items that decide whether using them is annoying
- Wardrobes and dressing rooms — decide based on what you actually own, not on catalogue photos
- Strength of the cabinet carcass — things you can know before something breaks
- Cove ceilings with hidden lights — why some homes get soft light and others see spots
- Curtains and curtain tracks — things to prepare before closing the ceiling, though you buy them a year later
- Wallpaper, mirrors and feature walls
- Lighting — decided when the wiring is run, but you find out the result when you move in
- Three documents you must receive at the end of the finishing work
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use