Sign up
Account & tools
General guidance only — all construction work must be overseen by a supervising engineer This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers Use it to know what to look at, what to ask and what evidence to request on site It is not an engineering determination and can't replace an engineer · Terms of use · Limitations of the handbook

Throughout construction

Disputes and mediation

Page code P51 · 46 inspection criteria · 2 illustrations

The most misunderstood point on this page is that there are two clocks, not one. The first is Section 600, which requires defects to appear within one year of handover, or within five years if the work is a structure built on the land…

Read the full version free — log in first

The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members

Log in to read this page

This page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)

© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use