General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Handover and after moving in
Annual maintenance plan
- This page contains
- The day you first notice a symptom — a date you can't recreate later
- The house logbook — six columns every line must have
- Monthly — ten minutes you can do entirely yourself
- Every six months — before and after the rainy season
- Annually — a day you must set aside entirely
- Every five years — and why year five must be inspected most thoroughly
- The line between maintenance and defects — and the evidence to keep on both sides
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use