No matching tool — try another word, press Ctrl K to search the whole site, or open the user manual
Every newly built house must have a building permit (form Or.1) before work starts under the Building Control Act. Building without one carries fines, and local officials can order work stopped or the building demolished. Worse, the house can't get a house number or permanent water/electricity meters, and is hard to sell or mortgage
Submit documents to the local authority where the land is → officials check the design complies with building control law (setbacks, height, open space, parking) → results within 45 days by law; in practice a typical house often gets approval in 2–4 weeks if no design changes are needed. Fees are hundreds to a few thousand baht depending on area — the permit is valid for 1 year and can be renewed before it expires
Setbacks are where designs fail most: walls with openings (windows) must be at least 2 meters from the boundary, solid walls at least 50 centimeters (closer requires the neighbor's written consent), and eaves count as part of the building. Designing for this from the start saves a lot of time on revisions. Another point is later extensions — anything over 5 m² also needs a permit