General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Piles and foundations
Footing excavations, existing soil and sand bedding
- This page contains
- The sequence for this phase — ten steps, and which ones you can't get wrong
- How deep to dig — what to add to what
- The soil at the bottom of the pit — a decision point, not just an inspection point
- Water in the pit — the easiest point to check and the most often skipped
- Cutting pile heads — the sequence matters more than the tools
- Sand bedding and the width of each layer
- Soil termite treatment — the first moment of termite work, and it's today
- Side forms for the lean concrete, and measuring the thickness twice
- Marking the pile centres — making eccentricity visible
- Backfilling after the footings are cast
- Documents and photos for this phase
- Pits and trenches under 2 metres deep — overseas criteria you can ask for as extras
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use