Piles and foundations
Reinforcement for footings and stub columns
- This page contains
- The reinforcement sequence — seven steps, from the steel arriving on site
- Receiving steel on site and storage
- Acceptable condition of steel
- Bending steel — cold bending only, and the bend must not be too tight
- Hooks at bar ends
- Concrete cover and permitted tolerances
- Stub-column steel — when the upper column is smaller than the lower one
- Lap lengths and where bars may be spliced
- Placing, tying and securing the cage
- Final inspection before pouring, and keeping evidence
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members