General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Structure
Ground-floor beams and slab — precast planks, cast-in-place slabs and pipes under the floor
- This page contains
- Precast plank floor sequence — eight steps in a few days
- Before laying the planks — beam tops must be level and pipes must be finished
- Bearing length on beams, notching planks and ledger beams
- Precast planks — inspect once laid, before the topping is poured
- Propping under the slab — planks carry themselves but not wet concrete
- Lock bars, wire mesh, spacer blocks and mortar pads
- Plank ends and joints between planks — steel you must see before the topping is poured
- Topping pour day and curing the slab
- Before the first bar is laid — beam string lines, and the hold point people often skip
- Steel not yet tied — the steel stack, hooks and cranking bars through the column core
- Tied beams — six things you can see with the naked eye, and the cover people often get wrong
- Photos that count as evidence — a whiteboard with the grid line
- Top steel and bottom steel — different jobs, different positions
- Beam stirrups and cover
- Pipes that must pass through beams — holes to plan in advance, not drill afterwards
- Cast-in-place slab on grade — another system, nothing like precast planks
- Sanitary pipes under the floor — work that can never be repaired for the life of the house
- Pipes coming up through the slab — holes that cut the steel, and the steel that must replace it
- Soil, sand and lean concrete — formwork that can't be removed
- Tying the steel for a cast-in-place slab — spacers, bar chairs and hooks
- Pouring day for a cast-in-place slab — what must be ready before the first truck arrives
- Slab on grade — work for which Thai standards give no figures
- Permitted tolerances for beams and slabs
- Photos and videos of the floor work
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)