General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Structure
Ground-floor structural columns — steel, formwork and pouring
- This page contains
- Ground-floor column sequence — eight steps, and the step that starts before the steel
- Transferring lines to the floor — why offset lines are needed
- The first question to ask before inspecting anything at all
- Column ties — why the top and bottom zones must be closer together
- Ties — size, bend angle and the tails that must extend inside
- Cranked bars — the point where bending starts has a set position
- Concrete cover for columns, and checking before the formwork is closed
- Column formwork, and props that actually work
- Column pouring day — pour in layers, and the vibrator hose must reach the bottom
- At what level to stop pouring the column
- Checking column plumb — measure along two axes
- Lap position of column starter bars — what to ask before deciding it's wrong
- Curing columns — columns stand in sun and wind on all four sides
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use