General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Walls and architectural work
Installing frames, doors and windows, and waterproofing around frames
- This page contains
- Can this wall have a window? — the law has already answered
- The first thing to ask for — the installation manual for the frame system actually used
- Three things must be around the opening before the frame goes in
- During installation — three things that must be right together, each measured differently
- Five things the supervision manual says to check together — and the accessories that are often forgotten
- Around the frame — mortar that isn't packed tight is an invisible water path
- Sealant around frames — why silicone that fills the whole gap fails first
- Weep holes and water-spray testing
- Bathroom windows — their size is set by figures in the law
- Glass — whom the law applies to, and whether your house is included
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use