General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Walls and architectural work
Waterproofing bathrooms, balconies and roof decks
- This page contains
- Hold point — and the sentence you must say from the day you sign the contract
- Floor fall — the only figure on this page that is law
- Bathrooms have nine legal requirements, not one
- Before applying waterproofing — if the area isn't ready, even the best waterproofing loses
- Pipe sleeves — the mechanical reason leaks keep recurring around pipes
- Five spots where waterproofing is often missing — all visible to the eye
- Four items the supervision manual says to inspect — and the one it says to photograph
- Flood testing — how to do it and what to look for
- Balconies and roof decks — unlike bathrooms, they face real sun and rain
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use