General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Handover and after moving in
Testing systems before handover — electrical, plumbing and leaks
- This page contains
- Why everything must happen before the final instalment
- The one principle of this page — see the figures on the instrument, not on paper
- Plumbing — there are three tests, not one
- Water pressure or air pressure — a question that couldn't be answered before, and now can
- Water tanks — the standard even says how many grams of chlorine powder to use
- Finding a leak during testing — the repair method the standard explicitly forbids
- Outdoor water pipes — the standard sets it by the clock, not by steps
- Electrical system — the figures I can't confirm for you, and why you can still inspect it
- Water-spray testing around the house — no Thai standard, but you can do it yourself
- Documents you must receive before paying the final instalment
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use