General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Throughout construction
As-built drawings and photos before work is covered up
- This page contains
- Three sets of drawings — and the set nobody is required to hand over
- Two sections of law that make as-built drawings important
- What as-built drawings must show — things you can't see once the work is covered
- Photos before covering up — which kinds can stand in for drawings
- Accept the as-built drawings before paying the final instalment
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use