General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Handover and after moving in
After moving in and claiming under the workmanship warranty
- This page contains
- Two clocks you must satisfy
- Protection has three bases, not one
- What to do when you find a defect — the order that preserves your rights
- Who bought the items decides which legal route applies
- The first year — an inspection schedule to do yourself
- Extending after moving in — the one stage where the homeowner is the one in the wrong
- Which work you can do straight away — six exemptions in the Ministerial Regulation
- Where does knocking down count as demolition — a term that needs a separate permit
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use