General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Handover and after moving in
Room-by-room inspection before accepting the house
- This page contains
- Before booking the inspection — what condition the house must be in, and what we must bring
- The walking order — five layers in one room, and two rounds at different times
- Ten symptoms you must find — and what each one is telling you
- Raking light — the one technique that changes the results most
- Rooms that must be inspected differently from others — and what's specific to each
- Write a snag notice that can't be argued with — and send it the right way
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use