General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Before construction and preparing the land
Floor level, land filling and flooding
- This page contains
- The figures 10 and 25 centimetres — real, but not for detached houses
- Why this is the most irreversible decision in the whole house
- Find the highest flood level ever recorded — an afternoon's work nobody else will do for you
- Four levels to put on one sheet of paper before deciding
- Filling land — what soil, how to fill it and when
- Water flowing onto your neighbour's land — a problem that starts in the first month and lasts twenty years
- How to get your own local bylaws — works in every province
- Documents and photos you must get from setting levels and filling land
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use