General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Before construction and preparing the land
Sun, wind, rain and site planning at the design stage
- This page contains
- Sun — the south and west sides get strong sun
- Walls, glass and roof on the sun-facing sides
- Wind and rain — Thailand's two monsoon seasons
- The relevant laws — and the laws that don't apply to houses
- Before signing off the drawings — five questions you need answered on paper
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use