General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Before construction and preparing the land
Soil investigation before designing the foundations
- This page contains
- Who must have a soil investigation report — three groups written in the law
- Without a report — the maximum soil bearing capacity you can use
- Piles in clay — the skin friction you can use without a report
- If you commission a soil investigation — what the report must contain
- Spread footings and filled ground — two points to know before choosing not to use piles
- Time scope of this Ministerial Regulation, and what goes into the house file
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members
Log in to read this pageThis page can't be printed from the browser — use the "Print for site" button on the page (project name and location required)
© 2026 bhoonkharn.com · all rights reserved under the Copyright Act B.E. 2537 (1994) · Terms of use