No matching tool — try another word, press Ctrl K to search the whole site, or open the user manual
A BOQ (Bill of Quantities) is a document that breaks the whole house build into line items with the quantity, unit, material price and labor cost of each — simply put, an "advance receipt" for the whole house
A standard BOQ is divided into major sections in construction order: site preparation, piles and footings, structure, roof, walls and plaster, floors, ceilings, doors and windows, painting, electrical, plumbing and sanitary, and sanitary ware. Each line needs 4 numbers: quantity × material unit price + quantity × labor unit price
With BOQs from 2–3 contractors, don't just look at the total; compare section by section. One that's unusually cheaper in the structural section may be cutting steel or cement specs, which you can't see after the house is built. Price differences in finishing are understandable, but structure should be similar across all contractors
Bhoon Kharn has a free BOQ quotation tool, both for homeowners who want reference prices and for contractors who need to issue documents to customers. Try it under the "BOQ quotation" menu