General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Piles and foundations
Formwork for footings, stub columns and ground beams
- This page contains
- The formwork sequence — four jobs done on different days
- Formwork materials and condition
- Formwork panel sizes — how wide to cut and how high
- Props and braces — know the name of each piece and you can point out what's missing
- Ground-beam soffit formwork — when the beam soffit is at ground level
- Ground-beam soffit formwork — when the beam is raised off the ground
- Concrete cover — and the shortcut that must never be taken
- When to strike the formwork — there's a table for it
- Permitted tolerances
- Final inspection before pouring, and keeping evidence
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members