General guidance only — all construction work must be overseen by a supervising engineer
This handbook is compiled from standards and laws with every source cited, andis being reviewed for certification by engineers
Use it to know what to look at, what to ask and what evidence to request on site
It is not an engineering determination and can't replace an engineer
· Terms of use · Limitations of the handbook
Piles and foundations
Pouring day for footings, stub columns and ground beams
- This page contains
- Before the first mixer truck arrives — walk round and count everything
- The right to stop the pour — the one point that gives all the inspection its meaning
- Two things to do before pouring that take less than ten minutes
- Conveying and placing — concrete can segregate
- Pour in layers, and vibrate down into the layer below
- Slump, vibration and taking sample cubes
- Time and weather
- Construction joints — if the pour can't be finished in one go
- After the pour — a timeline to follow
- Curing — 7 days is not a figure you can cut
- Honeycombing on the concrete surface — don't let it be plastered over yet
- Photos and documents for pouring day
- Sample cubes and acceptance criteria — the only evidence that proves it
- If the test results fail
Read the full version free — log in first
The full version has step-by-step checks, pass criteria, the source of each criterion and illustrations · available only to logged-in members